Recent Technical Analysis Signals for BSLK - Bolt Projects Holdings, Inc.
Date | Name | Type | % Chg |
---|---|---|---|
Lower Bollinger Band Touch | Weakness | 17.06% | |
Oversold Stochastic | Weakness | 17.06% | |
Fell Below 20 DMA | Bearish | -13.29% | |
Inside Day | Range Contraction | -13.29% | |
Wide Bands | Range Expansion | -13.29% | |
Gapped Down | Weakness | -13.29% | |
Oversold Stochastic | Weakness | -13.29% | |
Crossed Above 20 DMA | Bullish | -23.75% | |
Stochastic Buy Signal | Bullish | -23.75% | |
Pocket Pivot | Bullish Swing Setup | -23.75% |
Recent Comments
- TraderMike on BOOT
- Dr_Duru on BOOT
- TraderMike on Stochastic Reached Oversold
- SuccessfulGrasshopper897 on Stochastic Reached Oversold
- Cos3 on Adding float as advanced filter criteria?
From the Blog
Featured Articles