Critical Path Stocks List
Symbol | Grade | Name | % Change | |
---|---|---|---|---|
ONTO | F | Onto Innovation Inc. | 2.80 | |
SNCR | F | Synchronoss Technologies, Inc. | 0.21 |
Related Industries: Semiconductor Equipment & Materials Software - Application
Related Stock Lists:
Cloud Computing
Cloud Infrastructure
Computing
Electrical Engineering
Electronic Engineering
Electronics
IT Infrastructure
Identity Management
Integrated Circuits
Interconnects
Lithography
Metals
Metrology
Process Control
Reliability
Semiconductor
Semiconductor Device Fabrication
Semiconductor Devices
Software
Transistor
Symbol | Grade | Name | Weight | |
---|---|---|---|---|
TINY | F | ProShares Nanotechnology ETF | 3.86 | |
NBDS | B | Neuberger Berman Disrupters ETF | 3.12 | |
PSI | F | PowerShares Dynamic Semiconductors | 2.21 | |
LOUP | B | Innovator Loup Frontier Tech ETF | 2.2 | |
LIVR | F | Intelligent Livermore ETF | 2.03 |
Compare ETFs
Related Industries:
Semiconductor Equipment & Materials
Software - Application
Related Stock Lists:
Cloud Computing
Cloud Infrastructure
Computing
Electrical Engineering
Electronic Engineering
Electronics
IT Infrastructure
Identity Management
Integrated Circuits
Interconnects
Lithography
Metals
Metrology
Process Control
Reliability
Semiconductor
Semiconductor Device Fabrication
Semiconductor Devices
Software
Transistor
- Critical Path
Critical Path is a project management technique used to identify the sequence of activities that must be completed on time in order for a project to be completed on schedule. It is a network diagram that shows the sequence of activities and their dependencies, and the amount of time each activity will take. The critical path is the longest path through the network diagram, and any delay in any activity on the critical path will delay the entire project.
Popular Now
Recent Comments
- TraderMike on BOOT
- Dr_Duru on BOOT
- TraderMike on Stochastic Reached Oversold
- SuccessfulGrasshopper897 on Stochastic Reached Oversold
- Cos3 on Adding float as advanced filter criteria?
From the Blog
Featured Articles