Recent Technical Analysis Signals for SHNY - Bank Of Montreal MicroSectors Gold 3X Leveraged ETNs due January 29, 2043
Date | Name | Type | % Chg |
---|---|---|---|
180 Bullish Setup | Bullish Swing Setup | 0.00% | |
Pocket Pivot | Bullish Swing Setup | 0.00% | |
Upper Bollinger Band Walk | Strength | 0.00% | |
Above Upper BB | Strength | 0.00% | |
Gapped Up | Strength | 0.00% | |
Up 3 Days in a Row | Strength | 0.00% | |
Crossed Above 50 DMA | Bullish | 5.28% | |
MACD Bullish Centerline Cross | Bullish | 5.28% | |
BB Squeeze Ended | Range Expansion | 5.28% | |
Gapped Up | Strength | 5.28% |
Recent Comments
- TraderMike on Bollinger Band Squeeze
- TraderMike on Bollinger Band Squeeze
- OpenCat584 on Bollinger Band Squeeze
- Dr_Duru on Expansion Breakout
- TraderMike on New Scans: Strong, Oversold Stocks and Weak, Overbought Stocks
From the Blog
Featured Articles